• 3 minutes e-car sales collapse
  • 6 minutes America Is Exceptional in Its Political Divide
  • 11 minutes Perovskites, a ‘dirt cheap’ alternative to silicon, just got a lot more efficient
  • 6 mins GREEN NEW DEAL = BLIZZARD OF LIES
  • 7 days The United States produced more crude oil than any nation, at any time.
  • 7 hours Could Someone Give Me Insights on the Future of Renewable Energy?
  • 7 days How Far Have We Really Gotten With Alternative Energy
  • 10 days James Corbett Interviews Irina Slav of OILPRICE.COM - "Burn, Hollywood, Burn!" - The Corbett Report
  • 10 days The European Union is exceptional in its political divide. Examples are apparent in Hungary, Slovakia, Sweden, Netherlands, Belarus, Ireland, etc.
Charles Kennedy

Charles Kennedy

Charles is a writer for Oilprice.com

More Info

Premium Content

Europe’s Energy Crisis Could Force The Large Hadron Collider To Be Idled

  • A combination of factors is feeding into a major energy crisis in Europe at the moment, forcing households to ration their power and industrial companies to shut plants.
  • Now, the Large Hadron Collider, the world’s largest and most powerful particle accelerator may have to be idled to ensure grid stability in France and Switzerland.
  • The European Organization for Nuclear Research, CERN, will shut down other accelerators first, claiming that it could reduce its power use by 25% without idling the LHC.
Large Hadron Collider

The energy crisis in Europe is not only disrupting businesses and household finances, but it’s also hitting at the heart of crucial scientific research and experiments. 

The European Organization for Nuclear Research, CERN, the world’s largest particle physics lab and home of the Large Hadron Collider, could shut down some accelerators and could even idle the LHC to ensure grid stability in the nearby French and Swiss regions amid the severe energy crisis in Europe, Serge Claudet, chair of the CERN energy management panel, told The Wall Street Journal

Europe is experiencing an unprecedented energy crisis amid halted Russian gas supply via the Nord Stream pipeline, low nuclear power generation in France, a power crisis in Switzerland, and sky-high gas and power prices.    

Large European industrial companies have already announced plant or production line closures due to soaring gas and energy prices, while governments in Europe are drafting plans to potentially ration gas supply to industries according to their specific priorities.  

The crisis became much worse at the end of last week, when Russian gas giant Gazprom said after three-day maintenance on Friday that Nord Stream would remain shut until “operational defects in the equipment are eliminated”, upping the ante in its gas war against Europe. 

For most governments in Europe, the indefinite suspension of Russian gas flows through the main pipeline to Germany wasn’t a surprise; they had expected such a move from Putin. But this doesn’t make the EU’s task of ensuring lights and heating on this winter any easier. Switzerland and France – whose grids CERN uses to power its supercollider and seven other particle accelerators to study matter and two decelerators to study antimatter – are among the worst hit.   

Switzerland has admitted that the country might have to resort to using oil for electricity generation this winter as Europe is dealing with low levels of Russian natural gas supply, which could be cut even further or cut off altogether.

In France, year-ahead power prices surged to $1,001 (1,000 euro) per megawatt-hour for the first time ever last month. French power prices have now soared tenfold over the past year, as drought and hot weather this summer have added to France’s nuclear power generation problems at the worst possible moment. EDF will restart all its nuclear reactors in the country this winter, French Energy Transition Minister Agnès Pannier-Runacher said last week. Currently, more than half of EDF’s reactors are out of operation either because of maintenance or technical issues. 

One of EDF’s largest clients is none other than CERN, which uses 1.3 terawatt hours of electricity annually. That’s enough power to fuel 300,000 UK homes for a year. At peak consumption, usually from May to mid-December, CERN uses about 200 MW, which is about a third of the amount of energy used to feed the nearby city of Geneva in Switzerland. 

May to mid-December is the period of active work at the Large Hadron Collider, the world’s largest and most powerful particle accelerator, which discovered ten years ago the existence of the Higgs boson that gives mass to the elementary particles. The collider was just restarted this July after a three-and-a-half-year hiatus for upgrades. 

However, due to the energy crisis, CERN is now considering how it could idle the world’s most powerful collider. 

“Our concern is really grid stability, because we do all we can to prevent a blackout in our region,” Claudet told the Journal.  

ADVERTISEMENT

CERN and its power supplier, EDF, are now discussing the possibility of implementing daily warnings for power grid instability at the research complex to determine when it would need to conserve energy and use less electricity, the head of CERN energy management panel told the WSJ. The organization will shut down other accelerators first, before possibly having to resort to a shutdown of the world’s largest particle accelerator, he added. With the shutdown of some of the other accelerators, CERN could thus lower its power use by 25%.  

By Charles Kennedy for Oilprice.com

More Top Reads From Oilprice.com:


Download The Free Oilprice App Today

Back to homepage





Leave a comment

Leave a comment




EXXON Mobil -0.35
Open57.81 Trading Vol.6.96M Previous Vol.241.7B
BUY 57.15
Sell 57.00
Oilprice - The No. 1 Source for Oil & Energy News