• 3 minutes e-car sales collapse
  • 6 minutes America Is Exceptional in Its Political Divide
  • 11 minutes Perovskites, a ‘dirt cheap’ alternative to silicon, just got a lot more efficient
  • 18 hours GREEN NEW DEAL = BLIZZARD OF LIES
  • 2 days Could Someone Give Me Insights on the Future of Renewable Energy?
  • 2 hours How Far Have We Really Gotten With Alternative Energy
  • 1 day e-truck insanity
  • 11 hours An interesting statistic about bitumens?
  • 4 days "What’s In Store For Europe In 2023?" By the CIA (aka RFE/RL as a ruse to deceive readers)
  • 6 days Bankruptcy in the Industry
  • 4 days Oil Stocks, Market Direction, Bitcoin, Minerals, Gold, Silver - Technical Trading <--- Chris Vermeulen & Gareth Soloway weigh in
  • 7 days The United States produced more crude oil than any nation, at any time.
China Is Winning The Race for Affordable EVs

China Is Winning The Race for Affordable EVs

While U.S. and European automakers…

Shell Streamlines Prelude LNG Maintenance To Take Advantage Of Winter Demand

Shell has abandoned plans to have its floating LNG production platform Prelude offshore Australia out for a year for a major overhaul and has chosen instead for a quicker maintenance period of several months, as it looks to take advantage of strong gas demand, industry sources have told Reuters.

Prelude FLNG – the world’s largest floating liquefied natural gas facility offshore Australia – was also the first such platform worldwide, but it has been plagued by issues since shipping its first LNG cargo in June 2019.

Prelude has been under maintenance since August and this would take between two and several months, according to Reuters’ sources and a spokesperson for Shell.

“The current turnaround at Prelude commenced in August and is expected to take several months. This turnaround was originally scheduled to be completed in 2022 but was rescheduled to August 2023 due to industrial action, followed by cyclone season,” the spokesperson told Reuters.

Instead of a year-long turnaround, the plant will undergo a much shorter maintenance period, to be up and running for the winter gas demand in North Asia, according to Reuters’ sources with knowledge of the plans.

In May this year, Shell halted production at Prelude LNG due to a trip.

Between July and September last year, production and exports at Prelude LNG were disrupted due to industrial action at the facility as trade unions demanded higher wages.

After the pay dispute was settled, Shell had to shut down Prelude LNG again at the end of 2022 due to a fire that occurred on December 21. A small fire was detected on board Prelude in a turbine enclosure. While the fire was quickly contained using a hand-held extinguisher, and there were no injuries, production at the facility was shut down again. Prelude LNG resumed output around a month after the incident.

ADVERTISEMENT

Apart from being a major LNG producer, UK-based supermajor Shell is the world’s largest trader of liquefied natural gas.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com:



Join the discussion | Back to homepage



Leave a comment

Leave a comment

EXXON Mobil -0.35
Open57.81 Trading Vol.6.96M Previous Vol.241.7B
BUY 57.15
Sell 57.00
Oilprice - The No. 1 Source for Oil & Energy News