• 4 minutes Mueller Report Brings Into Focus Obama's Attempted Coup Against Trump
  • 7 minutes Countries with the most oil and where they're selling it
  • 10 minutes Stack gas analyzers
  • 13 minutes What Would Happen If the World Ran Out of Crude Oil?
  • 1 min US Military Spends at least $81 Billion Protecting OPEC Persian Gulf Oil Shipping Lanes (16% DoD Budget)
  • 15 mins Climate Change Protests
  • 3 hours "Undeniable" Shale Slowdown?
  • 1 hour China To Promote Using Wind Energy To Power Heating
  • 56 mins How many drilling sites are left in the Permian?
  • 13 hours U.S. Refiners Planning Major Plant Overhauls In Second Quarter
  • 2 hours Mueller Report Brings Into Focus Trump's Attempts to Interfere in the Special Counsel Investigation
  • 12 hours Gas Flaring
  • 21 hours Oil at $40
  • 17 hours Japan’s Deflation Mindset Could Be Contagious
  • 1 day Ecoside
  • 11 mins Tax Credits for Energy Storage
  • 4 mins Everything Is Possible: Germany’s Coal Plants May Be Converted to Giant Batteries

Breaking News:

Guaido Takes Strides To Topple Maduro

Artificial Intelligence Is Transforming Oil Trade

Artificial Intelligence Is Transforming Oil Trade

Artificial Intelligence has started to…

U.S. Greenlights Two Major LNG Export Projects

U.S. Greenlights Two Major LNG Export Projects

The U.S. Federal Energy Regulatory…

Russia’s First LNG Import Terminal At Kaliningrad Nears Launch

LNG arctic

Russia’s first liquefied natural gas (LNG) import facility in the exclave Kaliningrad on the Baltic Sea is close to start-up, S&P Global Platts reported on Friday, citing vessel tracking data and Asia-based traders.

The region of Kaliningrad, a Russian exclave squeezed in between Poland and Lithuania and without a land or maritime border with Russia, has been receiving natural gas supplies via the Minsk – Vilnius – Kaunas – Kaliningrad transit gas pipeline. Due to the region’s location, Russia’s gas giant Gazprom has been building the Kaliningrad LNG import, storage, and regasification terminal. LNG regasification will be carried out with a floating LNG unit (FLNG), according to Gazprom’s plans.  

According to S&P Global Platts vessel tracking and to shipping data provider VesselsValue, a newbuild Floating Storage Regasification Unit (FSRU), named Marshal Vasilevskiy, loaded a cargo of LNG at Singapore earlier in November and is heading for delivery.

This Asia-Europe LNG trade flow is a reversal of the typical Atlantic basin-Asia LNG flows. Gazprom must have procured the LNG cargo at an attractive price in order to make the arbitrage from Asia to Europe viable, traders based in Singapore told Platts.

Platts Analytics assumes that the Kaliningrad FSRU will begin operations in January 2019, senior gas analyst Andre Lambine said.

According to Gazprom, the Kaliningrad Region will be able to receive up to 2.7 billion cubic meters of gas per year thanks to the LNG import terminal, which will bolster the region’s energy security and make it self-sufficient with natural gas if need be.  

Ironically, Kaliningrad’s two land neighbors—Poland and Lithuania—are striving for their own energy security by lessening their dependence on Gazprom’s pipeline gas. Poland and Lithuania are among the European Union’s (EU) most vocal opponents to the Gazprom-led pipeline project Nord Stream 2 from Russia to Germany via the Baltic Sea, and have signed LNG supply deals to import LNG from the United States.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com:



Join the discussion | Back to homepage

Leave a comment

Leave a comment

Oilprice - The No. 1 Source for Oil & Energy News