X

Sign Up To Our Free Newsletter

Join Now

Thanks for subscribing to our free newsletter!

ERROR

  • 3 minutes Texas forced to have rolling brown outs. Not from downed power line , but because the wind energy turbines are frozen.
  • 7 minutes Scientists Warn That Filling The Sahara With Solar Panels Is A Bad Idea
  • 11 minutes United States LNG Exports Reach Third Place
  • 15 minutes Joe Biden's Presidency
  • 13 hours U.S. Presidential Elections Status - Electoral Votes
  • 8 hours Interest article about windmills and waterwheels in Europe
  • 3 hours Retired RAF pilot wins legal challenge over a wind farm
  • 1 day Speaker Pelosi, "Tear Down This Wall"
  • 2 days NYT:  The Supreme Court’s order (Re:  Trump’s tax returns) set in motion a series of events that could lead to the startling possibility of a criminal trial of a former U.S. president
  • 19 hours Chance for (Saudi)Arabian peninsula having giant onshore Gas too?
  • 1 day Disaster looming in UK offshore wind power
  • 2 days Wednesday Nikki Haley reached out to Trump for meeting at Mar-a-lago. Trump said No ! You blew it Nikki . . .
  • 17 hours “Cushing Oil Inventories Are Soaring Again” By Tsvetana Paraskova
  • 2 days Scientist clone endangered Black Footed Ferret from Ferret that died 30 years ago . It's a 100% exact genomic match.

India's GVK is Granted Approval for $6.3 billion Coal Mine in Queensland

After stating 128 conditions to be fulfilled, the Coordinator-General of Queensland, Australia granted environmental approval to India’s GVK Power and Infrastructure for the development of the $6.3 billion (A$6.4 billion) Alpha coal project, expected to be the largest in Australia when it is completed in 2016.

The mine will be situated in the Galilee Basin, 130km south-west of Clermont, and 360km south-west of Mackay. The proposed site will consist of six separate open-cut mines stretching north to south for approximately 24km.

The project will have an initial export capacity of 30 million tons of coal a year, and include the construction of a 495km railway to transport the coal from the mine to the port of Abbot Point near Bowen.

Jeff Seeney, the State Development, Infrastructure, and Planning Minister, said that $11 billion will be generated during the mines predicted three year construction phase, of which 80% will remain within the province of Queensland. He also remarked that “once Once operational, Queensland's economy should see an economic boost of $1bn per year from this mine alone,” and that “Australia can expect an $80 billion dollar rise in exports over the life of the mine (expected to be 30 years).”

The project is still due to undergo several assessments before it can be fully approved, but Queensland are hopeful for the revenue that it will bring to the area.

By. Joao Peixe of Oilprice.com



Join the discussion | Back to homepage



Leave a comment

Leave a comment

Oilprice - The No. 1 Source for Oil & Energy News