• 3 minutes Natural gas is crushing wind and solar power
  • 7 minutes OPEC and Russia could discuss emergency cuts
  • 11 minutes Is Pete Buttigieg emerging as the most likely challenger to Trump?
  • 1 hour So the west is winning, is it? Only if you’re a delusional Trump toady, Mr Pompeo, by Simon Tisdall
  • 17 mins Fight with American ignorance, Part 1: US is a Republic, it is not a Democracy
  • 4 hours Blowout videos
  • 12 hours Question: Why are oil futures so low through 2020?
  • 1 hour CDC covid19 coverup?
  • 3 hours Charts of COVID-19 Fatality Rate by Age and Sex
  • 11 hours Shorting Gold
  • 1 day Phase One trade deal, for China it is all about technology war
  • 6 mins Don't sneeze. Coronavirus is a threat to oil markets and global economies
  • 1 day Peak Shale Will Send Oil Prices Sky High
  • 3 hours “The era of cheap & abundant energy is long gone. Money supply & debt have grown faster than real economy. Debt saturation is now a real risk, requiring a global scale reset.”"We are now in new era of expensive unconventional energy
  • 3 days Democrats Plan "B" Bloomberg Implodes. Plan "C" = John Kerry ?
  • 11 days An inside look at the lifestyle of a Climate Change Activist
Alt Text

Petronas Halts all Imports of Iranian Crude in South Africa

Engen, a South African based unit of Petronas, has announced that it has halted all crude imports from Iran, which used to account for 80 percent of

Read more +
Alt Text

Acquisition of Maari 3D Seismic Survey Commences

Cue energy has just released good news regarding permits for projects in New Zealand

Read more +
Alt Text

Environmental Approval Extended for Tassie Shoal LNG Project

MEO Australia Ltd has just received environmental approval for its Tassie Shoal LNG project.

Read more +

Cue Releases Drilling Update on its Naga Utara-1 Well

Naga Utara-1 Well, Mahakam Hilir PSC, Indonesia

Cue Energy Resources Ltd (ASX: CUE; NZX: CUE) is pleased to provide the following update on the drilling status of Naga Utara-1. The well is located within the Mahakam Hilir PSC in the onshore Kutei Basin, Indonesia. The well operator is SPC Mahakam Hilir PTE Ltd (SPC).

As of the 9th March 2012 the sidetrack has been drilled in a 6 inch hole to 5066 feet measured depth (MD).

The high pressure gas zone seen in the original hole was again encountered from 4825 feet MD to 4880 feet MD. An additional gas bearing sandstone was encountered between 4975 feet MD to 5040 feet MD.

Due to high pressure gas influx from the lower sandstone interval and the rig equipment pressure rating now being close to the formation pressure encountered, the operator has decided to call total depth of the well (TD). The interval will be evaluated with wire-line logs.

The forward plan is to design an appraisal well to be drilled with appropriate high-pressure rig equipment.

The participants and their respective interests in the PSC are:

SPC Mahakam Hilir Pte Ltd (Operator) 60%
Cue Mahakam Hilir Pty Ltd 40%

Cue will continue to release reports

The full release can be found in the above pdf.

Oilprice - The No. 1 Source for Oil & Energy News