• 4 minutes China goes against US natural gas
  • 12 minutes WTI @ 67.50, charts show $62.50 next
  • 15 minutes Saudi Fund Wants to Take Tesla Private?
  • 1 hour Downloadable 3D Printed Gun Designs, Yay or Nay?
  • 18 mins Peak Oil is Now!
  • 12 hours Rattling With Weapons: Iran Must Develop Military To Guard Against Other Powers
  • 41 mins Russians hacking vs U.S., Microsoft President: Russians Targeting All Political Sides
  • 56 mins Corporations Are Buying More Renewables Than Ever
  • 7 hours VW Receives Massive Order Of 1,600 All-Electric Trucks
  • 15 hours Desperate Call or... Erdogan Says Turkey Will Boycott U.S. Electronics
  • 19 hours CO2 Emissions Hit 67-Year Low In USA, As Rest-Of-World Rises
  • 22 hours The EU Loses The Principles On Which It Was Built
  • 12 hours Batteries Could Be a Small Dotcom-Style Bubble
  • 22 hours Film on Venezuela's staggering collapse
  • 21 hours Saudi PIF In Talks To Invest In Tesla Rival Lucid
  • 18 hours Permian already crested the productivity bell curve - downward now to Tier 2 geological locations

Mecca to Become First Solar City in Saudi Arabia

Mecca, the birthplace of Muhammad, and Islam’s holiest city, has plans to become the first city in Saudi Arabia to run completely on solar power.

The Saudi Arabian government has said that it will invest $109 billion to establish a strong solar industry across the nation. The King Abdullah City for Atomic and Renewable Energy program is the jewel in this crown, and aims to develop 41 gigawatts of solar capacity over the next 20 years. 25 gigawatts will be installed in the form of solar thermal plants, and the remaining 16 gigawatts will be supplied by photovoltaic panels.

Adnan Amin, the director general of the International Renewable Energy Agency, said that “Mecca’s program complements that work and may provide a guide for other Middle Eastern cities on how to adopt the technology.”

Osama al-Bar, the Mayor of Mecca, is waiting to receive bids from developers to construct and operate the solar power plants, and will make a decision as to the winner by the 5th of January next year. The city will need 385 gigawatt-hours of power each year and the whole project should be finished by 2018.

By. Charles Kennedy of Oilprice.com



Join the discussion | Back to homepage

Leave a comment
  • Scottar on September 29 2012 said:
    I'll believe it when I see it but they neglect to admit that a lot of the raw materials are oil dependent. And your talking about a country that has money to burn. It's oil money!

    What are the Saudi's going to do when the panels wear out and the oil money runs dry? Neither solar nor wind are self sufficient to replace themselves. I have yet to see the manufacturing plants powered exclusively by both or either.

Leave a comment

Oilprice - The No. 1 Source for Oil & Energy News